Year 2021

  • December 2021
    Construction begins on the Horizonte wind project in Taltal, located in the Antofagasta region of Chile. In October 2018, Barlovento Chile Limitada was awarded the contract to carry out the "Wind measurement campaign in Tal Tal"...
  • Inauguración de la placa del Parque Eólico El Dorado
    November 2021
    On 4 November, the President of Bolivia, Luis Arce, and the Minister of Hydrocarbons and Energy, Franklin Molina, inaugurated El Dorado wind farm located in Cabezas, in the department of Santa Cruz, with a capacity of 54 MW, thus...
  • October 2021
      ENGIE Energía Perú, one of Peru's leading power generation companies, is building Punta Lomitas wind farm, which will be the largest wind farm in the country, with 57 wind turbines spread over 77 hectares and a total...
  • April 2021
    Polenergia SA is the first Polish private group in the energy sector formed by vertically integrated companies operating in the field of power generation from conventional and renewable sources, as well as in the trading and...
  • April 2021
    The Colombian Ministry of Mines and Energy has published a resolution determining a new auction of Non-Conventional Renewable Energy Sources (NCREF) to take place in October. The value of the target energy demand will be...
  • January 2021
    Barlovento Recursos Naturales S.L. has developed for UPME (Unidad de Planeación Minero-Energética de Colombia) a application whose purpose is to evaluate the coincidence of power availability for wind power generation between...